Bannock Construction Update – September
Brick restoration is continuing to the east of elevation of the building, and the beauty of exposing all sides of red brick building has emerged from the old painted structure. New window and door openings on all sides and floors of the building are shining natural light on the inside of the building, which give a clearer picture of the interior vision of the shared work space.
Brick restoration is continuing to the East elevation of the building and he beauty of the the exposed red brick is almost fully revealed. Window and door openings on all sides and levels of the building are shining natural light throughout the building and giving a clearer picture of the interior vision of the space.
The structural work is almost finished with minor footing revisions in the basement and construction of the stair cores, elevator cores, and mechanical room in the basement. The electrical rough in has started in under the basement slab and will work its way up in the building.